With a 10 years experience as a Structural Engineer I offer you a professional service for a not high price. If you are looking for honest, responsible and hard-working partner then try me. Email me please if you have any queries.
Piotr WERNER, MEng
Beneath are presented only the most interesting structures for which I did the calculations.That is the experience also from companies in which I worked previously.
BUILDINGS
Multi-storey insitu reinforced concrete framed block of apartments. TASKS: full structure 3D modeling in FEA software; slab design; column and wall design.
Steel framed building with precast concrete composite floors. TASKS: full structure 3D modeling in FEA software; all required calculations for the steel frame.
Two multi-storey insitu reinforced concrete framed blocks of apartments (up to 20 storey). TASKS: full structure 3D modeling in FEA software, stability check; core walls design, column and wall design; podium deck design with transfers; all reinforced concrete slabs design; all constructions stages considered (tower crane tied to building, core jump pouring)
Existing steel framed building with concrete composite floors. TASKS: full structure 3D modeling in FEA software; all required calculations for the steel frame due extra new loadings.
Tower crane base third party check. TASKS: check of slab and piles design.
Reinforced concrete raft. TASKS: plate design and retaining wall design; check of bearing pressure; estimation of vertical displacement
BRIDGES
600 m long prestressed concrete bridge build by balanced cantilever method; main span 110m. TASKS: initial spans design considering each construction stages; consideration of: creep, shrinkage, losses in prestress, etc.
Reinforced concrete arch bridge. TASKS: load capacity assessment of existing bridge
Reinforced concrete flyover with 25 spans. TASKS: full structure 3D modeling in FEA software; initial spans design; pile loads
Reinforced concrete pedestrian bridge. TASKS: full structure 3D modeling in FEA software; span design; pillar design; pile design
3 brick masonry bridges. TASKS: load capacity assessment of existing bridges.